Sustainable Datacenter Solutions

Compute at scale, powered responsibly.

End-to-end power, cooling, and energy-storage infrastructure for datacenters — engineered to cut PUE, add renewable capacity, and keep uptime at five nines.

Power — UPS A
Power — UPS B
ESS Module 01
ESS Module 02
CDU — Liquid Loop
PDU / Busway
N+1 Redundancy Active
Cooling Loop Nominal
PUE
1.18
Renewable Load Share
62%
Uptime SLA
99.999%
Cooling
Liquid + Air
N+1 / 2N power redundancy
PUE reduction, verified on-site
Liquid & air cooling integration
Renewable + storage integration
Why sustainable infrastructure

Lower your PUE, without lowering uptime.

Right-sized cooling, high-efficiency power conversion, and on-site storage work together to bring your facility's Power Usage Effectiveness down — measured against your own load data, not a vendor average.

Baseline PUE (legacy infrastructure)
With TerraVolt optimized infrastructure
Energy-cost savings
1.15–1.25
Typical achievable PUE range
↓ 20–35%
Cooling energy reduction
99.999%
Power availability SLA
Built for critical facilities

Every layer of the power and cooling stack, engineered together.

From the utility feed to the rack, each component is sized against your real IT load and redundancy requirement — not a generic template.

Resilient power architecture

N+1 and 2N UPS configurations with automatic failover keep critical loads online through utility disturbances.

Liquid & precision air cooling

Direct-to-chip and rear-door liquid cooling paired with precision air handling for high-density racks.

On-site energy storage

Battery systems buffer against grid volatility and shift load away from peak-tariff hours.

Renewable integration

Solar and grid-tied inverters blend into the same power architecture, reducing reliance on diesel backup.

Real-time DCIM monitoring

Live visibility into PUE, thermal load, and power draw, with alerting before a threshold is breached.

Modular, scalable design

Add power, cooling, and storage capacity in phases as compute demand grows, without a full re-fit.

The process

From load audit to a facility that runs itself.

UTILITY FEED UPS / ESS COOLING LOOP IT LOAD / RACKS
01

Load & energy audit

We review your IT load profile, utility billing, and existing PUE, then confirm redundancy tier, cooling type, and available renewable capacity.

02

Power & cooling design

UPS, energy storage, and cooling loop are sized together against your target PUE and uptime SLA, not designed as separate systems.

03

Phased installation

Power and cooling infrastructure is installed and commissioned in phases, so live racks stay online throughout the build-out.

04

Commissioning & DCIM handover

Full-load testing, failover drills, and a live monitoring dashboard are handed over before go-live.

Specifications

The numbers IT and facilities teams ask for first.

Capacity range250 kW – 5 MW critical IT load
Target PUE1.15 – 1.25
Power redundancyN+1 or 2N configurable
CoolingDirect-to-chip liquid, rear-door, or precision air
Energy storageLithium-ion, modular in 250 kWh blocks
Renewable integrationSolar PV, grid-tied hybrid inverters
MonitoringReal-time DCIM dashboard, SMS/email alerts
Uptime SLAUp to 99.999%
Facility & IT teams

Trusted by the people who carry the uptime SLA.

★★★★★

Our PUE dropped from 1.6 to under 1.2 after the cooling and power redesign, and we didn't lose a single hour of uptime during the cutover.

Data Centre Manager — colocation facility, UAE
★★★★★

The phased rollout meant live racks stayed online the entire time. The monitoring dashboard now flags thermal drift before it's an issue.

Head of Infrastructure — enterprise IT
★★★★★

Adding on-site storage and solar cut our diesel runtime dramatically without touching our redundancy tier.

Facilities Director — cloud services provider
Questions

What IT and facilities teams ask before we build.

Yes — power and cooling upgrades are phased so live racks and redundancy stay intact throughout the build-out, with cutover windows planned around your maintenance schedule.

Both N+1 and 2N configurations are available depending on your uptime SLA, with UPS, energy storage, and cooling sized to match.

It depends on site conditions and available roof or land area, but facilities typically see a meaningful reduction in diesel backup runtime and peak-tariff exposure — modeled against your own load data before you commit.

We review your current load profile, cooling type, and climate conditions to model an achievable PUE range before any equipment is specified.

Find out what your facility's PUE could look like.

Free load and efficiency audit using your own utility and IT load data — no generic sizing.

Scroll to Top