Electric Vehicle Charger Solutions

Charge every vehicle, without the wait.

AC and DC charging stations sized for homes, offices, retail, and fleet depots — installed, networked, and monitored end to end by TerraVolt.

Charger type
AC · Type 2
Power delivered
22 kW
Time to 80%
~1h 45m
AC & DC fast charging
OCPP-compliant, app-networked
Wall, pedestal & fleet mounts
Remote diagnostics & billing
Charging speed

Pick the charger that matches how you use it.

From an overnight home top-up to a 30-minute fleet turnaround — same infrastructure family, different power class.

AC · Single-phase 7 kW~8 hrs to full
Best for homes and overnight residential charging
AC · Three-phase 11–22 kW~2.5 hrs to full
Ideal for offices, retail parking, and residential compounds
DC Fast · 30–180 kW~30 min to 80%
Built for fleet depots, highway stops, and high-turnover sites
Product range

A charger for every site, mounting, and use case.

Every unit is OCPP-compliant and network-ready, so a single dashboard can manage a home charger and a fleet depot alike.

AC single-phase 7 kW

Compact home and villa charging, wall-mounted for overnight top-ups.

AC three-phase 11/22 kW

Faster AC charging for offices, retail, and residential compounds.

DC fast charging 30–180 kW

High-power stations for fleet depots and high-turnover public sites.

Customised configurations

Wall-mounted, pedestal-mounted, twin-output, and advertising-display units.

The process

From site survey to a live, networked charger.

EV charger installation
01

Site & load survey

We assess parking layout, expected vehicle turnover, and available electrical capacity to pick the right power class.

02

Charger & mount selection

AC or DC, wall-mounted or pedestal, single or twin-output — matched to how the site will actually be used.

03

Electrical installation

Certified electricians handle supply upgrades, cabling, and mounting with minimal disruption to the site.

04

Network setup & billing

Chargers go live on the OCPP network with monitoring, access control, and usage-based billing configured.

Where it fits

Anywhere people plug in and expect it to work.

Homes & villas
Offices & commercial towers
Hotels & hospitality
Retail & shopping malls
Fleet & logistics depots
Specifications

The numbers procurement teams ask for first.

AC single-phase7 kW, Type 2 connector
AC three-phase11 kW / 22 kW, Type 2 connector
DC fast charging30 kW – 180 kW, CCS2
Mounting optionsWall-mounted, pedestal-mounted
ConfigurationsSingle or twin output, advertising display
ConnectivityOCPP 1.6/2.0, 4G/Ethernet/Wi-Fi
Access & billingRFID, app, or ad-hoc payment
Warranty5-year hardware warranty
Site owners

Trusted by the people managing the parking lot.

★★★★★

Our fleet turnaround dropped once the DC fast chargers went live. Drivers are in and out in under half an hour.

Operations Manager — logistics fleet
★★★★★

The dashboard lets us manage every charger across three sites from one screen, including billing per session.

Facilities Lead — retail group
★★★★★

Installation was quick and the twin-output units doubled our bay capacity without adding new cabling runs.

Chief Engineer — residential compound
Questions

What site owners ask before installing chargers.

Often yes for higher-power DC units — the site survey checks your existing supply and confirms whether an upgrade is needed before installation.

Yes — RFID cards, an app, or ad-hoc card payment can all be configured, with usage tracked per session on the network dashboard.

Yes — twin-output units serve two bays from a single charger, sharing power dynamically between whichever vehicles are connected.

Every unit reports status over the network, so faults, offline chargers, or connector issues are flagged remotely before a driver reports them.

Ready to put chargers on your site?

Free site survey and charger recommendation based on your parking layout and expected usage.

Scroll to Top