Charge every vehicle, without the wait.
AC and DC charging stations sized for homes, offices, retail, and fleet depots — installed, networked, and monitored end to end by TerraVolt.
Pick the charger that matches how you use it.
From an overnight home top-up to a 30-minute fleet turnaround — same infrastructure family, different power class.
A charger for every site, mounting, and use case.
Every unit is OCPP-compliant and network-ready, so a single dashboard can manage a home charger and a fleet depot alike.
AC single-phase 7 kW
Compact home and villa charging, wall-mounted for overnight top-ups.
AC three-phase 11/22 kW
Faster AC charging for offices, retail, and residential compounds.
DC fast charging 30–180 kW
High-power stations for fleet depots and high-turnover public sites.
Customised configurations
Wall-mounted, pedestal-mounted, twin-output, and advertising-display units.
From site survey to a live, networked charger.

Site & load survey
We assess parking layout, expected vehicle turnover, and available electrical capacity to pick the right power class.
Charger & mount selection
AC or DC, wall-mounted or pedestal, single or twin-output — matched to how the site will actually be used.
Electrical installation
Certified electricians handle supply upgrades, cabling, and mounting with minimal disruption to the site.
Network setup & billing
Chargers go live on the OCPP network with monitoring, access control, and usage-based billing configured.
Anywhere people plug in and expect it to work.
The numbers procurement teams ask for first.
| AC single-phase | 7 kW, Type 2 connector |
| AC three-phase | 11 kW / 22 kW, Type 2 connector |
| DC fast charging | 30 kW – 180 kW, CCS2 |
| Mounting options | Wall-mounted, pedestal-mounted |
| Configurations | Single or twin output, advertising display |
| Connectivity | OCPP 1.6/2.0, 4G/Ethernet/Wi-Fi |
| Access & billing | RFID, app, or ad-hoc payment |
| Warranty | 5-year hardware warranty |
Trusted by the people managing the parking lot.
Our fleet turnaround dropped once the DC fast chargers went live. Drivers are in and out in under half an hour.
The dashboard lets us manage every charger across three sites from one screen, including billing per session.
Installation was quick and the twin-output units doubled our bay capacity without adding new cabling runs.
What site owners ask before installing chargers.
Often yes for higher-power DC units — the site survey checks your existing supply and confirms whether an upgrade is needed before installation.
Yes — RFID cards, an app, or ad-hoc card payment can all be configured, with usage tracked per session on the network dashboard.
Yes — twin-output units serve two bays from a single charger, sharing power dynamically between whichever vehicles are connected.
Every unit reports status over the network, so faults, offline chargers, or connector issues are flagged remotely before a driver reports them.
Ready to put chargers on your site?
Free site survey and charger recommendation based on your parking layout and expected usage.

